ACCEP from Brest (France), 40MW Park - Wartsila 18V38B Engine

Reception and commissioning of a thermal power plant equipped with 04 Wartsila engines Type: 18V38B at the Balingué V thermal power plant of the company EDM in MALI on behalf of the company. – 2011

42 Months of Assistance, Training, Operation and Maintenance in a thermal power plant equipped with 04 Wartsila engines Type: 18V38B at the 40 MW Balingue VI Thermal Power Plant of the company EDM in MALI on behalf of the company ACCEP in Brest with an equipped composed of a Technical Expert Ing in Mechanical Engineering, Technical Expert Ing in Electrical Engineering, Technical Expert Ing in Operation and a Head Central Expert. – 2011-2014

SAO TOME AND PRINCIPE EMAE Park- 12 MW

Provision of spare parts for the entire fleet and inspection 12000 H of the Caterpillar 3516B engine Replacement of an alternator. – 2013

TCHAD SNE (National company of Energy) 50MW Park

Evaluation of the thermal fleet with a view to ensuring the reliability of all equipment. – 2013

EDC Cameroon (Electricity Development Corporation) 100 MWPTU Park

Evaluation and audit of AGGREKO’s thermal power plant equipment on behalf of EDC. – 2014

ENEO CAMEROON (Energy of Cameroon)

Rehabilitation of the Bafoussam thermal power station Thermal power station equipped with 02 Pielstick Group and 01 Caterpillar Group Rated power: 12 MW – 2016

ENEO CAMEROON

Transfer of 30 MW containerized including distribution of scada and transformers from the Ahala thermal power plant to the newly developed Djamboutou thermal power plant.  – 2017

ENEO CAMEROON

Supply, installation and commissioning of 04 Caterpillar group type 3516 operating at 1.6 MW – 2018

SNE TCHAD (National company of Energy)

Rehabilitation of the GE2 group of the Farcha 1 thermal power plant and guaranteed on site for 12 months; Contract for control and monitoring of the rehabilitation work of the Djambalbahr thermal power station. – 2020-2021